Hiring a contractor….
Since we’ve decided who is going to paint the house (finally. yeah!), a few thoughts on how to hire a good contractor…
The key thing to remember, I think, is that any time you are hiring a contractor to do something, whether it’s paint your house or replace a toilet or whatever needs done, is to understand enough of what’s happening to know whether or not the contractor is doing a good job. In this situation, you are your own general contractor hiring a sub-contractor, so you need to understand what you’re hiring out.
Most good contractors will take the time to explain things you don’t understand; take advantage of that, but be aware that if you already know you won’t be accepting a given contractor’s bid, you’re wasting his time. That’s part of the reality of bidding a job and contractors factor that into their pricing, but it’s no excuse to abuse the relationship. you’re better off going back to the contractor you ARE hiring to ask questions you still have. of course, if you honestly aren’t sure who to hire, or whether the job is being bidded properly, you should keep asking questions until you do.
My first thought: “everyone” tells you to get three bids. Well, life’s not that simple. I have accepted the first bid. I’ve accepted the seventh bid. What’s important is that you keep talking to contractors until you find one you’re convinced will do the job properly for a price you feel is fair.
For instance, three weeks after we closed on the house, the furnace went kerplooey. We contacted a number of companies, and ended up working with one that could deal with the problem quickly at a good price. That led to further work — we’ve completely replaced the HVAC system, including reducting the house, and have done a couple of thousand in plumbing to the place since we’ve arrived. We don’t bid any of this out now, we call these folks; they aren’t the cheapest, but they’re wonderfully reliable, their work is first class, their systems are quality, and I can trust them. It makes no sense to go bidding for what we need these days.
Or when we re-roofed. One company has done seven or eight of the roofs on the block — the Eichler is a bit of a specialty, being a flat roof, and residential tar and gravel isn’t exactly common. But to get a sanity check on the price, we brought in a second company to bid; it was 40% higher, without the roof insulation we’d gotten added into the bid. No brainer, we went with the first company, and the R14 under the tar and gravel has made a huge difference to the livability of the house (and our energy bills… we had to spec up the air conditioner significantly when it was replaced because of the heat gain from the roof. Now, the airco is pretty bored, except on really hot days…0
And in one case — our first run at patio and hardscaping, we just gave up and put it off. That was during the high point of the dot com stuff, though, when every subcontractor was booked eight months in advance (or worthless), and people wouldn’t even come out to look at smaller jobs, and if they did, priced them high enough to make sure you wouldn’t accept their bids. ugh. These days, it’s a lot easier to find good subs…
So my point is — get as many bids as you need to get the right guy. To do that, you need to know enough about the job to know what a good one is, right? If you don’t, the sub ought to help you understand what needs to be done, but don’t completely trust them to tell you the entire truth. Try to find an uninvolved third party to help you understand what’s going on and/or evaluate bids with you.
So, here’s how I found our painting contractor. For the last year or so, I’ve been keeping an eye on paint jobs I’ve seen in the area. Residential, commercial, it didn’t matter, I just watched for jobs I liked, and tried to find out who did them. Some contractors put signs up, many have signage on their trucks or vans. it’s usually pretty easy. I tend to think contractors that use trucks with no signage at all are hiding something, because why not advertise (in many cases, they’re either unlicensed, or they’re small groups that are hired out by bigger companies as sub-sub-contractors. more on that later).
I also asked around to find out from folks I knew who were getting paint jobs who they used. In a few cases, I did it to make sure that company got thrown OFF my list (for instance, a house across the street was being repainted so it could be sold. the painters came in and prepped one day, did the main coat the next — and it rained a little that night. Next morning, they came in and did the trim. IMHO, that house needed at least 48 hours to dry before it should have been painted again — and the trim is already peeling, less than a year later. A company I definitely wouldn’t hire…). Also, I throw out companies who’s company vehicles are in bad shape. A contractor’s truck is going to be used (and used hard), and going to show wear, but a there’s a difference between a truck that shows use and one that (in the case of a painter) looks like it’s rented out weekends for paintball contests. A sloppy truck is, to me, sign of a sloppy work ethic, and that is a short walk from a sloppy job. If a sub doesn’t care about how their trucks look — what will my place look like?
I specifically look for small to medium, family or individual owned contractors who use their own crews. With big companies, you can get lost in the noise, and it’s hard to find someone who stands up and will be responsible. Many times, those big companies will hire out smaller companies to actually od the work — they’re effectively brokers, not contractors. This isn’t necessarily bad, since we did the front door that way through Home Depot and I thought the sub did a great job, but you lose some control, and you’re depending on the company hiring subs that will live to the company’s standards. the busier a company, the more likely that won’t happen. Basically, I want to know who the owner is, and how well he’ll back up the work. The closer you get to the owner of the firm, the better.
Remember that most contracting work is subjective (paint, which deals so much with color, is exceptionally so). A technically good job where the colors are off isn’t a success any more than perfect colors put on badly. So don’t minimize the need to be sympatico with your contractor on colors. A good contractor will help you get the colors you need, not necessarily the ones you want.
As I was watching paint jobs, one company kept showing up. I swear half of the jobs I saw that I really liked were done by this one firm. So they got called first. The owner came out two days later, surveyed the house, and wrote up the bid. We spent about 20 minutes discussing the prep work needed (easily 10, maybe 15 years since the last paint job, stucco with some settling cracks, a few other joys), and then another 20 minutes on paint colors, especially on the porch, we’re I’m rebuilding into a (hopeful) focal point.
He brought up certain aspects of the prep that would need special focus, and explained why he felt they ought to be done. he suggested upgrading to an Elastomer paint (basically, it covers and fills micro-cracks in stucco, and then stretches so they don’t come back), and went into some detail of what the house needed. His company is medium sized, about 50 people, but all work is done by employees, and supervised by foremen who are promoted up through the company. Those are very important guarantees to me that what the bidder says will be done, will be done. And then everything he suggested to me verbally was writen into the bid as documentation for the foreman.
The downside: he was about $700 more than I’d hoped, and about $1000 more than I wanted. Oh, and his trades vans are impeccably clean. You don’t have to wash them weekly, but it doesn’t hurt..
The second company was similar to the first — I’d seen a few jobs I liked, they advertised on the jobs. About a 70 person company. I got a full-time bid writer, not the owner. To be fair, I give all bidders the same job; even if something comes up with an earlier bid I want to adopt, I don’t add it to later bids. I want to see if other subs will come up with the same (or similar, or better) ideas. If not, you can always have them adjust the bid later — they won’t mind, and it’s fairest to all.
The second bidder had pretty much the same prep work specced out, which gives me confidence that this is what the house really needs. His bid differs slightly in a few ways, and in one major way. He doesn’t propose the elastomer paint; instead, he bids priming the entire house.
The third company I called out I called cold out of the yellow pages. I enjoy a bit of randomness, to make sure I’m not pre-judging myself into a corner. Small group, four employees, one crew. He was a no-show for his appointment (which happens); he called two days later, and it was a root canal that went bad, and he was in the emergency room. Like I say, stuff happens, so we rescheduled (but don’t expect me to call and ask why you didn’t show up.. but a contractor that calls, I’ll talk to).
We talked over the job, given the same premise as the first two.
final bids:
Bid #1: 3,600
Bid #2: 4,900
Bid #3: 1,900
Same job: $3,000 difference. Makes you wonder, huh?
I really liked the third contractor — but I don’t believe he properly bid the amount of prep work this house needs, and I don’t think his crew is really up to doing it. So while he’s the low bid, I’ve eliminated him — but I’m recommending him to my neighbor, who wants her house painted, and which is in good shape bcause it’s been painted three times in the last five years (thanks to two sales…). She’s so tired of white on white, and that crew is perfect for her house. Just not mine.
The difference between bid 1 and bid 2? Once you sit down and break down the bids, bid #1 and bid #2 are exactly the same price — except bid #2 added a full prime coat to the house.
And both bid #1 and bid #2 have bid a job that’ll do what we need — get the exterior fixed up, and get a quality paint job on it.
But IMHO, I’m convinced #1 will do better prep, and is dealing with the house through prep and with a better paint, while #2 went with a lower quality paint and a more labor intensive solution. It’s not wrong, it’s a different philosophy. Either way, we’ll end up with a well-done house. But the 2nd bid is more profitable for his company than the first bid will be to his company.
Which is why you need to know what kind of job you’re having done, and how it ought to be done. There’s not a thing wrong with that second bid, except that it’s slanted more to the contractor’s benefit than mine. If you don’t know any better, it can cost you a couple of thousand dollars and you’ll be happy with the results…
Of course, before I fully commit to bid #1, I’m going to ask him his opinion of the full prime, and see what he says. I think I know what the answer will be…